TR223 Regular Maintenance and Upgrading of Bridge
Project Details
The project comprises of various upgrading and maintenance works which include but not limited to the following scopes:
1. Upgrading of bridges involving post tensioning and strengthening of bridge, thickening of slab soffit and include of fibre wrap strengthening of slab soffit.
2. Replacement of bridges bearings and followed by replacement of expansion joints at various Flyover and vehicular bridges.
3. Regular maintenance repair of road structures at various locations involving works such as concrete spalling, steel repair, replacement and painting, removal and replacement of facilities, expansion joints and damaged elements on road structures.
The above works shall include the making good and reinstatement of the affected works in the surrounding areas.
Client | LTA |
Completion Date | On-Going |